Skip to main content

2 docs tagged with "calendar"

View all tags

4D/5D Scheduling Overview

The 4D/5D schedule page opens in a separate browser tab from the main Conio interface. When you click the schedule link from within a project, Conio opens a dedicated scheduling workspace at the same localhost:8000 address. This separation keeps the heavy Gantt rendering isolated from the main estimating workflow, and allows you to have the schedule and the cost workspace open side by side.

Your First Schedule

Goal: Turn a priced, costed scenario into a working CPM schedule with a Gantt chart, an S-curve, and an exported programme.