4D/5D Scheduling Overview
The 4D/5D schedule page opens in a separate browser tab from the main Conio interface. When you click the schedule link from within a project, Conio opens a dedicated scheduling workspace at the same localhost:8000 address. This separation keeps the heavy Gantt rendering isolated from the main estimating workflow, and allows you to have the schedule and the cost workspace open side by side.
AI Schedule — Automatic Predecessor Inference
AI Schedule analyses your BOQ structure and infers construction-logical predecessor relationships automatically, then iterates until the resulting S-curve meets an acceptable quality threshold.
Manual Adjustments After AI Scheduling
AI Schedule produces a construction-logical starting point. Manual adjustments let you encode project-specific constraints the AI cannot know: client access restrictions, equipment availability windows, phased handover dates, or contractual milestone pins.
Your First Schedule
Goal: Turn a priced, costed scenario into a working CPM schedule with a Gantt chart, an S-curve, and an exported programme.